In-floor heat was installed today. The metal roof and the siding are going up this week. The concrete for the flooring will be poured later this week. The plumbing, electrical, lighting and HVAC are on deck for going in next.
We have $148,000 left to raise out of the 2.1 million that was needed for the barn to be complete. No loans, no debt, just a structure built by God to continue to share the Gospel and teach people about Jesus.
Would you consider helping us cross the finish line on this project by making a donation?